Pilot Project 2025

Challenges

High traffic area

Near a College

Protects students and Pedestrians

Key Results

Increased student safety

Sense of Community safety

1 day Installation

A large tree stands by an empty parking lot in front of a multi-story building on a clear, sunny day. There are a few scattered clouds in the blue sky and power lines run across the scene.

The Challenge

The City of Littleton had a very busy roadway corridor that ran along the front of a Community College very near downtown Littleton's Main St. This area sees a significant amount of college students on bikes and on foot. It also see a lot of bicycle travel by citizens visiting Main street. The challenge was to protect the bicyclists and pedestrians while maintaining acces to bus stops, parking lot entrances and side streets.

"We were so excited to take advantage of the FREE Pilot Project Program. We were able to secure and protect over 850 feet of bike lane on a very congested roadway in front of the college. Done in one day and free!

A street with a bike lane runs alongside parked cars and orange traffic cones, with trees lining the sidewalk and buildings visible in the background under a partly cloudy sky.

The Solution

A separated bike lane runs alongside a street with white barriers and an arrow painted on the pavement. Trees line the sidewalk, and houses are visible in the background under a clear sky.
The City of Littleton became one of the first cities in America to take advantage of our risk-free Pilot Project Program. Littleton was able to install almost 250 liner feet of SAFE-T Lane Dividers on Church St along the entrance and parking lots of Arapahoe Community College in just one day! Installing SAFE-T Lane Dividers in broken chains allowed them to retain parking lot access, bus stop access and side road access on almost 850 feet of roadway. College students and citizens alike now benefit from the added protection along this busy corridor.
A large, solid green right-pointing triangle set against a light background.

Broken chain installation

A large, solid green right-pointing triangle set against a light background.

7 Intersections and bus stops accomodated

A large, solid green right-pointing triangle set against a light background.

Custom City graphics

Installation Timeline: Under 6 Hours

Critical Success Factors

850 linear feet of bike lane protected with under 250 linear feet of SAFE-T Lane Dividers
Retained all access points to the college and sideroads
Aesthetically pleasing to the community
Pilot project success